Promulgated: December 26 2000
Effective: as of date of promulgation
Interpreting authority: State Economic and Trade Commission
Applicability: County or higher level power grid dispatch institutions, power grid operators and power producers connected to grids in the PRC shall comply with these Measures (Article 2).
State Economic and Trade Commission, Disclosure of Power Grid Dispatch Information Tentative Measures
国家经贸委电网调度信息披露暂行办法
Promulgated: December 26 2000Effective: as of date of promulgationInterpreting authority: State Economic and Trade CommissionApplicability: County or higher…
By
clpstaff
& clp articles

