State Economic and Trade Commission, Administration of Cost Limits in the Construction of Electric Power Projects Tentative Measures

国家经济贸易委员会电力工程建设定额工作管理暂行办法

Promulgated: July 12 2001Effective: as of date of promulgationInterpreting authority: State Economic and Trade CommissionApplicability: These Measures…

1 minute readSeptember 02, 2001 at 12:58 AM
By
clpstaff
& clp articles

Promulgated: July 12 2001
Effective: as of date of promulgation
Interpreting authority: State Economic and Trade Commission
Applicability: These Measures are applicable to the administration of industry cost limits and


A Subscription is Required to Access this Content

Subscribe to China Law & Practice today for:

  • ✓ A database of 3000+ essential documents, including key PRC laws translated into English
  • ✓ Newsletters with business-critical and sector-specific updates
  • ✓ Premium mobile access with timely analysis on China's fast-changing market

Already a Subscriber? Log In. Sign In Now

Questions? Contact us at [email protected] | 1-855-808-4530 (Americas) | 44(0) 800 098 386009 (UK & Europe)